Drilling Rig

20T(F) Goodeng trenchless machine horizontal directional drilling machine

Jiangsu Goodeng Heavy Machinery Equipment Technology Co., Ltd.
  • Engine Power:113 kw
  • Max Torque:6500 N·m
  • Max Mud Pump Flow:250 L,Min
  • Transport Package:Nude Packing
  • Specification:6750*2050*2400 mm
  • Trademark:Goodeng

Base Info

  • Model NO.:GD 200F-LS
  • Origin:China
  • HS Code:843041
  • Production Capacity:2000,Year

Description

Basic Info.

Model NO. GD 200F-LS Origin China HS Code 843041 Production Capacity 2000/Year

Product Description

Horizontal Directional Drilling Machine
  
[Main Performance Characteristics]

  

1. The machine is equipped with Cummins Engine with high efficiency, large power, low fuel consumption, low noise,and strong ability in construction.
2. The Rotation adopts American EATON large torque motor driving directly, which contains large torque, stable performance, and two gears speed regulation. Push & pull adopts American EATON motor and three gears speed regulation. The Construction speed is far ahead in the same level industry. Driving head reserves reinforced power -push & pull force, which expands the scope of drilling construction.
3. It is equipped with hydraulic gear pump with military technology; Caterpillar moves by wire-control, which is convenient for load & unload and transfer.
4. The operation table adopts man-machine construction manner, which is comfortable for operation, and can greatly reduce workers fatigue level, with broad vision and comfortable seat.
5. It is equipped with φ60×3000mm drill rod, and the machine uses less field area, which meets the requirement for high efficiency construction in small place.
6. The electric design is reasonable with low failure rate, which is easy to maintain.
7. The rig shape is beautiful, and easy to repair, which fully shows "people-oriented" design idea.

  
[Main Technical Parameters]

   
Engine Power113 kwMax Torque6500 N·m
Rig Weight9500 kgDimension(L*W*H)6750*2050*2400 mm
Max. Push & Pull Force225/300 knMax Rotation Speed230 r/min
Max.. Push & Pull Speed60 m/minMax. Mud Pump Flow250 L/min
Caterpillar Walking Speed2.5-4.0 km/hMax. Mud Pump Pressure8 Mpa
Enter Drill Angle12-22°Max. Climbing Gradient17°
Max. Aperture DiameterΦ750 mm(Soil Depended)Max. Crossing Length300 m(Soil Depended)

[Product Photos ]
    
20T(F) Goodeng trenchless machine horizontal directional drilling machine
20T(F) Goodeng trenchless machine horizontal directional drilling machine

20T(F) Goodeng trenchless machine horizontal directional drilling machine
20T(F) Goodeng trenchless machine horizontal directional drilling machine


[Company Information]

20T(F) Goodeng trenchless machine horizontal directional drilling machine
20T(F) Goodeng trenchless machine horizontal directional drilling machine

[Company Profile]

  
"Goodeng Machine", founded in May 2002, is specialized in research & development, manufacturing, sales and service for trenchless equipment, static-pressure pile pressing-in & pile planting machine, and geological drilling equipment. Our main products are GD series of horizontal directional drilling machine. As mechanization Research branch industrialization base of China Academy of Building Research, Goodeng Machine has independently developed almost 30 models of horizontal directional drilling machine from 5T to 1200T with strong and professional R & D team's support, which is filled of multiple domestic and abroad blanks. More products have obtained national and provincial progress prize in science and technology of machinery industry.
   
[Competitive Advantage]

  1. Competitive Price: We work as the leading dealers of various leading China construction machinery factories, and are treated with best dealership prices every year. From numerous comparisons and feedbacks from clients, our price is more competitive than other factories.
2. Quick Response: Our team is consisted of a group of deligent and enterprising people, working 24hrs/day to respond clients'  inquiries and questions all the time. Most problems can be solved within 12 hours.

  
[FAQ]
  
1. What about the warranty time?
    A:12 months after shipment or 2000 working hours,whichever occuts first.
2. What about the delivery time?
    A:20 days after receiving the deposit.
3.What kind terms of payment can be accepted?
    A:On T/T term, 30% down payment is required in advnce, and 70% balance shall be before shipment, or
        against the copy of original BL for old client.
        On L/C term, 100% irrevocable L/C without"soft clause" can be accepted. 

4.What logistics ways we can work for shipment?
    A: We can ship machine by sea and road.