
GS8000-LS Horizontal directional drilling machine
Jiangsu Goodeng Heavy Machinery Equipment Technology Co., Ltd.- After-sales Service:provided
- Warranty:provided
- Certification:ISO 9001:2000, ISO 9001:2008
- Condition:New
- Drill Hole Diameter:2000 mm
- Drill Hole Depth:3000 m
Base Info
- Model NO.:GS8000-LS
- Bit Type:Drag Bit
- Drilling Way:Rotary
- Type:Trailer
- Engine Power:3*410 kW
- Max Torque:210000 N·m
- Max Mud Pump Flow:Extra Mud Pump
- Transport Package:Nude Packing
- Specification:21600*2700*3900mm
- Trademark:Goodeng
- Origin:China
- HS Code:843041
- Production Capacity:2000,Year
Description
(Soil Depended)
(Soil Depended)

1.Three sets Cummins engine can meet different working conditions and save energy.
2.German Rexroth high-pressure large-flow swash plate axial plunger pump and motor.
3.High pressure electric control open-circuit system is more energy-saving.
4.The open-circuit is composed of classic Sauer high-pressure load sensitive oil pump and proportional control multi-way valve.
5.Best quality filters with high filtration ability ensures the cleanness of system and extends maintenance interval.
6.The electrical system includes a series of independent design of safety control system and auxiliary control software.
7.The main rig is trailer type (the tug can be turned independently).
8.The main rig luffing device is adopted for small range movement without headstock and assisting swerving
9.12 sets of push & pull motor equipped with manually high-strength large-torque clutch can be performed alternatively to extend the life of motors and reducers.
10.Wire controlling is adopted for the rig.
11.The machine is equipped with slurry pressure releasing device.
12.The transmission type of driving head is rack & pinion.
13.Equipped with manipulator to enhance the efficiency of loading/unloading rods.




1. What about the warranty time?
A:12 months after shipment or 2000 working hours, whichever occurs first.
2. What about the delivery time?
A:20 days after receiving the deposit.
3.What kind terms of payment can be accepted?
A: On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client.
On L/C term, 100% irrevocable L/C without "soft clause" can be accepted.
4.What logistics ways we can work for shipment?
A: We can ship machine by sea and road.
5. What about the after-sales service?
A: We have office and professional after-sales service team in many countries. After you receiving the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.