Drilling Rig

(JXY200L) Vertical Spline Core Drilling Rig

Beijing Jincheng Mining Technology Co., Ltd.
  • Certification:CE, ISO 9001:2000
  • Condition:New
  • Motor:AC Motor
  • Drill Hole Diameter:75-300mm
  • Drill Hole Depth:30-200m
  • Bit Type:Drill Bit

Base Info

  • Model NO.:JXY200L
  • Drilling Way:Compound
  • Type:Crawler
  • Transport Package:Standrad Export Packing
  • Specification:3300*1700*2500mm
  • Trademark:JCDRILL
  • Origin:China
  • HS Code:8430419000
  • Production Capacity:2000sets,Year

Description

2 front jacks and 2 rear jacks.TypeHydraulicStroke 350 mmDimensions Overall length 3300 mmOverall width 1700 mmOverall height 2500 mm
Application                                                                                                                                                              
JXY200L muntipurpose crawler mounted hydraulic spindle core bore drilling machine is designed for Geological survey and prospecting, exploration roads and high-rise building foundation, as well as a variety of concrete structure inspection holes,rivers and dams, embankment grouting hole drilling and grouting direct civilian wells and geothermal central air conditioning.
Themachine is reasonable in structure, simple in operation, convenient in maintenance and convenient in transportation, and no need to lift by crane after it is transported to the site.

Pictures
(JXY200L) Vertical Spline Core Drilling Rig


Characteristics                                                                                                                                                       
1.The hydraulic control drill mast can be raised and put down by the hydraulic cylinders,which increases labor safety; saves time and labor usage.
2.The drilling rig adopts automatic telescopic mast, hydraulic cylinder support, hydraulic control drilling tower up
and down, the operation saves time and labor, is safe and reliable.
3.The rubber wire track is light in weight and does not damage the urban road.
4.Four long hydraulic stands can lift the machine to Max. height 1.3m so that the rig can be loaded and unload from the truck.
5.24V electric start for diesel engine permits the rig to work in all kind of extreme weather condition.
6.The hydraulic tube twist machine can be installed, which saves time and increases the working efficiency to unload the rod.

Service 
1. We have service team to supply professional guidance for installation.
2. Our quality inspection department will check each of machine before leaving the factory.
3. We offer one-year quality warranty for main body of machine.
4. All of machines we sold hold the ISO, QC, TUV certificates and so on

Certificate
(JXY200L) Vertical Spline Core Drilling Rig

FAQ                                                                                                                                                                       
Q: Are you original manufacturer?

A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have
the whole series products you need.
Q: Which payment terms are available to us?
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment.On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted.
Q: Which Incoterms 2010 terms can we work?
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR,CIP.
Q: How long will the delivery time take?
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.
Q: How about after sales service?
A: 365×24 Year-round Service We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours."
Q:Spare Parts When You Need Them
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.