Drilling Rig

(CWD300) Crawler Mounted Mining Drilling Rig Portable Drilling Rigs Water Well Crawler

Beijing Jincheng Mining Technology Co., Ltd.
  • After-sales Service:Free
  • Warranty:1 Year
  • Condition:New
  • Motor:24V
  • Drill Hole Diameter:>300mm
  • Drill Hole Depth:300m

Base Info

  • Model NO.:CWD300
  • Bit Type:DTH
  • Drilling Way:Rotary
  • Type:Crawler
  • Transport Package:40gp Container
  • Specification:6300*2000*2450mm
  • Trademark:JCDRILL
  • Origin:China
  • HS Code:8430412900
  • Production Capacity:2000sets,Year

Description

Dimension30Net WeightT8.531Shipping Lengthmm4800/630032Shipping Widthmm200033Shipping Heightmm245034Ground Clearancemm320

PRODUCT CONFIGURATION

(CWD300) Crawler Mounted Mining Drilling Rig Portable Drilling Rigs Water Well Crawler(CWD300) Crawler Mounted Mining Drilling Rig Portable Drilling Rigs Water Well Crawler     (CWD300) Crawler Mounted Mining Drilling Rig Portable Drilling Rigs Water Well CrawlerFamous Hydraulic Control Valve  YUCHAI 70KW EngineHigh power hydraulic pump         (CWD300) Crawler Mounted Mining Drilling Rig Portable Drilling Rigs Water Well Crawler(CWD300) Crawler Mounted Mining Drilling Rig Portable Drilling Rigs Water Well Crawler    (CWD300) Crawler Mounted Mining Drilling Rig Portable Drilling Rigs Water Well Crawler High Hydraulic Support LegHeavy Duty Rubber Crawler  1.5Ton Hydraulic Tool Winch

PRODUCTS LOADING
(CWD300) Crawler Mounted Mining Drilling Rig Portable Drilling Rigs Water Well Crawler
SUCCESSFUL PROJECT
(CWD300) Crawler Mounted Mining Drilling Rig Portable Drilling Rigs Water Well Crawler

FAQ

Q: Are you original manufacturer?

Q: Which payment terms are available to us?

Q: Which Incoterms 2010 terms can we work?

A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need.

 

 

A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70%  balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted.

A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP.

 

 

Q: How long will the delivery time take?

Q: How about after sales service?

Q:Spare Parts When You Need Them

 

A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.

 

 

A: 365×24 Year-round Service
We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours."

A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.